Art Institute of Philadelphia

Photo Album

This was a big crazy project with Graebel and CBRE.  Seventeen floors.  Downtown Philly.  Two phases, two weeks apart.  Elevators that went on strike when they felt like it.  By City mandate, we could not start to load before 6:00 PM.  Graebel assigned two crews:  one to break down and stage during the day, the second to load each night.  Starting at 6:00, we loaded three or four trailers a night over ten weeks, a total of 29 trailers, and usually got to bed by midnight.

Scroll to Top
Verified by MonsterInsights